Devi Heating Systems'DSOT-34 cables for in-slab heating, can be used for installation into one room or the whole building. The floor heating cables are tied to the top reinforcing mesh (usually L72/L82) before the slab is poured and provide economical warmth 24 hours a day, 7 days a week.
Construction: Single heater conductor with silicon insulant, high temperature PVC inner sheath, copper braid and then a high temperature HDPE outer sheath.
APPLICATIONS:
Suitable for connection to an Off-Peak II or continuous 24 Hour Tariff for underfloor heating requiring Direct or Background Heating in houses, offices, public buildings, factories, schools, nursing homes etc.